Tapping oak wedges around the base of the sculpture
Tapping oak wedges around the base of the sculpture
Securing the lift platform and sculpture plinth
Securing the lift platform and sculpture plinth
Pairs of Teflon slides placed between sculpture and plinth
Pairs of Teflon slides placed between sculpture and plinth
2-ton capacity slings (green) secured around base of sculpture
2-ton capacity slings (green) secured around base of sculpture, with plastizote protection (white) between sculpture and sling
Pallet trucks fit into spaces in the custom-built plinth
Pallet trucks fit into spaces in the custom-built plinth to allow for easier movement of the Monument to Lady Winchelsea
Repositioning the plinth
Repositioning the plinth